Beaver Island ArchiveA primary-source archive & encyclopedia45°40′N 85°33′W · Lake Michigan
Colour scheme
Search

Event

Emerald Isle ferry engines undergo rebuilding, 2013

Also Emerald Isle ferry engine rebuild 2013

Draft — sources verified, prose evolving

TypeEvent
Date2013-03
WithinBeaver Island
ErasModern era
On this page
Event
Date
2013-03
Kind
Transportation
Eras
Modern era
Concepts
transportationmaritimeinfrastructurecommunication
Within
Beaver Island

Summary

The March 2013 Beaver Beacon reported that Michigan CAT was rebuilding both engines of the Emerald Isle at a cost of $165,000 per engine. The notice described the ferry as approximately 15 years old.

Evidence limits

The newspaper report does not give the maintenance schedule, final cost, or technical outcome of the rebuild.

Sources

  1. Beaver Beacon, March 2013, "Good Tune."
    Reports that Michigan CAT was rebuilding the Emerald Isle's engines at a cost of $165,000 each and notes that the ferry was already 15 years old. No public copy of this file is known; the archive holds one and can provide it on request.
    data1 · beaver-island-archive · beaver_beacon · 2013-03_Beaver-Beacon
  2. The held March issue scan confirms the ferry maintenance report.
    data1 · beaver-island-archive · scans · beaver_beacon · issues · 2013-03_Beaver-Beacon
  3. After residents reported conflicting rumors, News on the Net posted a June 28 release attributed to Beaver Island Boat Company describing a June 25 main-engine parts failure, use of the Beaver Islander, revised schedules, vehicle-height limits, and a St. James Marine barge partnership. The release is stronger than the surrounding speculation but remains a contemporaneous operating notice, not a final repair report.
    forum · www.beaverislandforum.com · 06 · t006386

Added 7 August 2026. Recent changes

Cite this article

Beaver Island Archive, “Emerald Isle ferry engines undergo rebuilding, 2013”, https://beaverislandarchive.org/events/beaver-island-emerald-isle-engine-rebuild-2013/, accessed [date], citing Beaver Beacon, March 2013, "Good Tune." (and 2 further sources listed on the page).

Last revised 2026-08-07. Fill in [date] with the date you read it — this page is static and cannot know that.

BibTeX for “Emerald Isle ferry engines undergo rebuilding, 2013”RIS for “Emerald Isle ferry engines undergo rebuilding, 2013”