
- Date
- 2002-09-01
- Kind
- Opening
- Where
- Beaver Island
- Eras
- Modern era
- Concepts
- communicationcommercecommunity
- Within
- Beaver Island
Summary
Great Lakes Energy completed the Beaver Island Internet upgrade before its September 1, 2002 changeover. The October report says dial-up speeds improved from 31.2 kbps to 45–52 kbps with compression, with few dropped connections and wireless equipment installed for some in-town users.
Evidence limits
The account is an early user report, not a network-performance study, coverage map, or service-level agreement.
Sources
- Beaver Beacon, October 2002, “GLE Internet up and running.”Reports GLE completing the upgrade ahead of the September 1 changeover, dial-up speeds rising from 31.2 kbps to 45–52 kbps with compression, fewer dropped connections, and wireless equipment installed in town. No public copy of this file is known; the archive holds one and can provide it on request.data1 · beaver-island-archive · beaver_beacon · 2002-10_Beaver-Beacon
- The held issue scan confirms the GLE upgrade report.data1 · beaver-island-archive · scans · beaver_beacon · issues · 2002-10_Beaver-Beacon
Added 5 August 2026. Recent changes
Cite this article
Beaver Island Archive, “Great Lakes Energy completes Beaver Island’s Internet upgrade ahead of the September 1, 2002 changeover”, https://beaverislandarchive.org/events/beaver-island-gle-internet-upgrade-september-1-2002/, accessed [date], citing Beaver Beacon, October 2002, “GLE Internet up and running.” (and 1 further source listed on the page).
Last revised 2026-08-05. Fill in [date] with the date you read it — this page is static and cannot know that.
BibTeX for “Great Lakes Energy completes Beaver Island’s Internet upgrade ahead of the September 1, 2002 changeover”RIS for “Great Lakes Energy completes Beaver Island’s Internet upgrade ahead of the September 1, 2002 changeover”