Event

St. James Harbor improvement work expands during the 1965 season

Also 1965 Beaver Island harbor development

Draft — sources verified, prose evolving

Locator map: Saint James Harbor highlighted within the Beaver Island archipelago
Took place at Saint James HarborLocator plate © OpenStreetMap contributors (ODbL 1.0); depths NOAA; names USGS GNIS. How the plates are drawn.
TypeEvent
Datescirca 1965-02 – 1965-08
WithinBeaver Island
ErasModern era
On this page
Locator map: Saint James Harbor highlighted within the Beaver Island archipelago
Took place at Saint James HarborLocator plate © OpenStreetMap contributors (ODbL 1.0); depths NOAA; names USGS GNIS. How the plates are drawn.
Event
Dates
circa 1965-02 – 1965-08
Kind
Construction
Where
Saint James Harbor
Eras
Modern era
Concepts
constructionmaritimetransportationtourismeconomy
Within
Beaver Island

Summary

St. James Harbor underwent a connected set of improvements during the 1965 season. The old Beaver Islander freight shed was removed, a replacement shed was planned, new private and commercial docks were being piled, the old mill dock was being revived as Beaver Haven Marina, and the Yacht Dock addition advanced from active construction toward near completion.

Evidence and limits

The four local reports distinguish completed removal from planned or ongoing work. They do not supply contracts, permits, final dimensions, dredging records, or a completion inspection for each project.

Open questions

  • When was the Yacht Dock addition completed and accepted?
  • What legal, engineering, or ownership records document the new docks and the Beaver Haven Marina project?

See also

Sources

  1. Reports removal of the old Beaver Islander freight shed, construction of a replacement shed with an information window, Jewell Gillespie’s dock, the revival of the old mill dock as the planned Beaver Haven Marina, private dock piling work, and an expected Yacht Dock addition.
    data1 · beaver-island-archive · beaver_beacon · 1965-04_Beaver-Beacon
  2. The held seven-page issue scan is paired with the OCR source and confirms the published notice or report; it does not expand the source-specific identity, event, or outcome claims.
    data1 · beaver-island-archive · scans · beaver_beacon · issues · 1965-04_Beaver-Beacon
  3. Prints a drawing of the planned replacement for the Gallagher Dock and says the new dock was expected to be completed by July 1; Archie LaFreniere drew it and Phyllis Gregg made the stencil. This is a plan, not a completion or engineering record.
    data1 · beaver-island-archive · beaver_beacon · 1965-02_Beaver-Beacon
  4. The held eight-page issue scan is paired with the OCR source and confirms the published notice or report; it does not expand the source-specific identity, event, or outcome claims.
    data1 · beaver-island-archive · scans · beaver_beacon · issues · 1965-02_Beaver-Beacon
  5. Reports Superior Sand and Gravel barges and equipment entering St. James Harbor for the Yacht Dock addition, removal of Gallagher Dock pilings, and planned dredging. The late start and July 1 target are reported plans, not a completion record.
    data1 · beaver-island-archive · beaver_beacon · 1965-06_Beaver-Beacon
  6. The held seven-page issue scan is paired with the OCR source and confirms the published notice or report; it does not expand the source-specific identity, event, or outcome claims.
    data1 · beaver-island-archive · scans · beaver_beacon · issues · 1965-06_Beaver-Beacon
  7. Says Yacht Dock construction was still underway as boats increased, creating temporary crowding for boaters and workers.
    data1 · beaver-island-archive · beaver_beacon · 1965-07_Beaver-Beacon
  8. The held six-page issue scan is paired with the OCR source and confirms the published notice or report; it does not expand the source-specific identity, event, or outcome claims.
    data1 · beaver-island-archive · scans · beaver_beacon · issues · 1965-07_Beaver-Beacon
  9. Reports the Yacht Dock addition nearly complete and describes it as a major harbor improvement, without giving a final inspection or completion date.
    data1 · beaver-island-archive · beaver_beacon · 1965-08_Beaver-Beacon
  10. The held six-page issue scan is paired with the OCR source and confirms the published notice or report; it does not expand the source-specific identity, event, or outcome claims.
    data1 · beaver-island-archive · scans · beaver_beacon · issues · 1965-08_Beaver-Beacon

Added 2 August 2026 · revised 3 August 2026. Recent changes

Cite this article

Beaver Island Archive, “St. James Harbor improvement work expands during the 1965 season”, https://beaverislandarchive.org/events/beaver-island-harbor-improvements-1965/, accessed [date], citing Beaver Beacon, April 1965, “More Harbor Development.” (and 9 further sources listed on the page).

Last revised 2026-08-03. Fill in [date] with the date you read it — this page is static and cannot know that.

BibTeX for “St. James Harbor improvement work expands during the 1965 season”RIS for “St. James Harbor improvement work expands during the 1965 season”