Beaver Island rebuilds the Cable’s Creek hiking-trail footbridge and plans a swamp walkway in 1997

Also Cable's Creek Bridge trail improvement 1997

Draft — sources verified, prose evolving

Locator map: Cable's Creek highlighted within the Beaver Island archipelago
Took place at Cable's CreekLocator plate © OpenStreetMap contributors (ODbL 1.0); depths NOAA; names USGS GNIS. How the plates are drawn.
TypeEvent
Dates1997-05 – 1997
WithinBeaver Island
ErasModern era
On this page
Locator map: Cable's Creek highlighted within the Beaver Island archipelago
Took place at Cable's CreekLocator plate © OpenStreetMap contributors (ODbL 1.0); depths NOAA; names USGS GNIS. How the plates are drawn.
Event
Dates
1997-05 – 1997
Kind
Construction
Where
Cable's Creek
Eras
Modern era
Concepts
recreationinfrastructureconservationcommunitycommunication
Within
Beaver Island

Summary

Doug Tilly and Vince Pickhardt rebuilt the Cable’s Creek hiking-trail footbridge in spring 1997, replacing it with a more stable arched bridge. The Trails, Parks, and Campgrounds Committee also planned a wooden walkway through the swamp at Johnny Martin’s Trail so the trail system could connect Hannigan’s Road with Lake Geneserath for foot and ski travel.

Evidence limits

The report establishes the bridge work and planned walkway but does not provide construction dates, costs, surveys, or proof that the walkway was completed.

Open questions

  • Was the planned wooden walkway through the swamp at Johnny Martin’s Trail ever built, connecting Hannigan’s Road to Lake Geneserath?
  • Does the arched bridge Tilly and Pickhardt built at Cable’s Creek in 1997 survive today, or has it since been replaced?

If you can answer any of these, or correct anything above, the archive wants to hear it — see Corrections.

Sources

  1. Reports Doug Tilly and Vince Pickhardt replacing the Cable's Creek footbridge with a more stable arched bridge, and describes a planned wooden walkway through the swamp at Johnny Martin's Trail to connect the trail system from Hannigan's Road toward Lake Geneserath. The holding institution's portal restricts automated access; the archive holds a copy of this issue and can provide it on request.
    data1 · beaver-island-archive · beaver_beacon · 1997-08_Beaver-Beacon
  2. The held issue scan confirms the trail-bridge and walkway report.
    data1 · beaver-island-archive · scans · beaver_beacon · issues · 1997-08_Beaver-Beacon

Added 5 August 2026. Recent changes

Cite this article

Beaver Island Archive, “Beaver Island rebuilds the Cable’s Creek hiking-trail footbridge and plans a swamp walkway in 1997”, https://beaverislandarchive.org/events/beaver-island-cables-creek-bridge-trail-improvement-1997/, accessed [date], citing Beaver Beacon, August 1997, “Cable's Creek Bridge.” (and 1 further source listed on the page).

Last revised 2026-08-05. Fill in [date] with the date you read it — this page is static and cannot know that.

BibTeX for “Beaver Island rebuilds the Cable’s Creek hiking-trail footbridge and plans a swamp walkway in 1997”RIS for “Beaver Island rebuilds the Cable’s Creek hiking-trail footbridge and plans a swamp walkway in 1997”