Summary

The June 1971 Beaver Beacon reported that a submarine power cable was nearly installed to supply Beaver Island. Luedtke Engineering was laying the cable from the Cross Village shore, through a 26-mile route to the Beaver harbor entrance, past the St. James light, and to the island generator plant.

The account describes two 58-ton cable reels on a crane barge, a 36-inch-deep trench, a midway splice, and a maximum cable tension of 800 pounds.

Evidence and limits

This is a source-qualified construction report. The newspaper does not state the completion date, final route, as-built depth, service start, ownership, contract terms, or whether the diesel generator plant was actually retired as the normal power source.

See also

Sources

  1. Beaver Beacon, June 1971, “Island Based Fuel Supply.”
    Reports a nearly installed 26-mile submarine cable laid by Luedtke Engineering from the Cross Village shore to Beaver harbor entrance and onward past the St. James light to the generator plant; it gives the cable, trench, barge, splice, and tension details but does not report completion, a final route survey, or an installation date.